The siteImagery: Esri, Maxar
Green Mountain has a data center in operation in Innlandet. It is listed at 90 MW.
90 MWreported power
Operatingstatus
The facts on file
Sources
Everything above comes from these. Open one and check it yourself.
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.