Home/United States/Arizona/Maricopa County/Aligned Waddell Campus (PHX-12/13/14)
Aligned Waddell Campus (PHX-12/13/14) data center, Waddell, Arizona
8805 N Reems Rd, Waddell, AZ 85355
Aligned Data Centers·Under construction·72 MW·announced 2025
Aligned Data Centers is building a 100-acre data center campus on North Reems Road in Waddell, in Maricopa County, Arizona, where it broke ground on the first of four planned buildings, PHX-13, in April 2025. PHX-13, at 8805 N. Reems Road, is a 72-megawatt data center, and the campus is also planned to hold PHX-12 and PHX-14.
Aligned bought the 100 acres at 8785 N Reems Road in December 2024 for $86.5 million from LXP Industrial Trust, according to Cushman and Wakefield. The site was once a rose farm. A City of Glendale economic development official described the campus as having over 1 million square feet of data hall space. Aligned's PHX-07, also on North Reems Road at 8785, was due to go live in 2025.
Power for the campus will come over a new 230-kilovolt transmission line from Arizona Public Service. Aligned says it will cool PHX-13 with its Delta3 air cooling arrays and a closed-loop system that recycles water, and that turning the rose farm into a data center campus cuts annual water use by more than 73%. The company says it kept the site's unused well rights, so the groundwater stays on-site. Glendale Mayor Jerry Weiers welcomed the project at the groundbreaking. "This project and all the benefits it will bring are exciting for our Glendale community," he said.
West Glendale has more data centers coming, and not all of them have been welcomed. In April 2026 the Glendale City Council voted unanimously for a pre-annexation development agreement for Project Baccara, two data center buildings north of Olive Road and half a mile west of Litchfield Road near Luke Air Force Base, which the City of Surprise says will be powered by natural gas generators. Luke Air Force Base officials wrote that the project is not compatible with the base's noise and accident potential unless certain conditions are met. "The noise of this 24/7 is nothing like the 10–15 seconds that a jet makes when it goes over," said Dave Krause, who lives nearby. On May 6, 2026, the Maricopa County Board of Supervisors voted 4-1 to issue that project a military compatibility permit after its developer agreed to conditions set by the base commander, with Supervisor Steve Gallardo voting no.
The facts on file
- Company
- Aligned Data Centers
- Address
- 8805 N Reems Rd, Waddell, AZ 85355
- County
- Maricopa County, Arizona
- Country
- United States
- Status
- Under construction
- Power
- 72 MW
- Announced
- 2025
- Operating or planned
- 2025
- Record checked
- Sep 16, 2026
Sources
Everything above comes from these. Open one and check it yourself.
- www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-data-center-in-phoenix-arizona/
- www.yourvalley.net/glendale-independent/stories/aligned-breaks-ground-on-west-glendale-data-center,576844
- www.fox10phoenix.com/news/new-data-centers-planned-glendale-spark-concerns-among-residents
- www.kjzz.org/politics/2026-05-06/controversial-data-center-project-in-west-valley-near-luke-air-force-base-cle
Other projects nearby
Sites we track within 40 km.
- Project Baccara3 km
- Microsoft El Mirage5 km
- Compass El Mirage (PHX II)6 km
- QTS Glendale7 km
- Vantage Phoenix (Goodyear)13 km
- Compass Goodyear (Phoenix)14 km
- Aligned Peoria Logistics Parklisted on the Maricopa County page14 km
- STACK Phoenix (Avondale)16 km
Moratoriums covering this site
| Place | Type | Started | Ends | |
|---|---|---|---|---|
| Maricopa County | Zoning limits | Dec 10, 2025 | No end date | Record off site ↗ |
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.