Global Data Centers.formerly Florida Data Centers

Home/Data centers/Denmark

Data centers by place

Data centers in Denmark: 11 projects mapped

11 projects tracked
·
3 proposed or being built
·
7 operating
·
1 with no stage on record
·
954 MW from the 4 active projects that report a figure
Prime Esbjerg (ESB01) (Proposed, 550 MW)Prime Sæby (Denmark) (Not reported, 124 MW)atNorth DEN02 (Varde) (Proposed, 250 MW)atNorth DEN01 (Copenhagen) (Operating, 30 MW)Google Fredericia (Operating)Meta Odense (Operating)Google Aabenraa (Proposed)Microsoft Køge (CPH03) (Operating)Apple Viborg (Operating)Digital Realty Copenhagen Ballerup (Operating)Bulk DK01 Campus (Esbjerg, Denmark) (Operating)
Boundaries: Natural Earth
Tracked projectBigger dot, more power11 sites shown

Denmark's power grid is full, and data centers are being pushed to the back of the line. On March 2, 2026, the state grid operator Energinet stopped signing new large connections after requests reached 60 gigawatts, against national peak demand of just over 7 gigawatts. Emergency legislation introduced on August 20 would give households, small businesses and green-energy projects first call on the grid and put data centers last. Parliament is reviewing it, and the rules are meant to apply when grid requests are next assessed this autumn.

The biggest new plan is Data Center Kassø, on 105 hectares of farmland at Kassøvej 26, about 15 kilometers west of Aabenraa and 2 kilometers from the village of Hjordkær. The applicant, Dapsi International ApS, plans four large buildings over about six years, with up to 185 backup diesel generators and about 400 staff. Aabenraa municipality set the scope of its environmental review on April 27, 2026; an environmental report, a draft permit and a public hearing come next.

Google bought land beside the Kassø substation, where the Danish and German grids meet, in 2017. Denmark's operating data centers include Google's in Fredericia, Meta's in Odense, Apple's in Viborg and Microsoft's around Køge. Climate and Energy Minister Samira Nawa has blamed "foreign datacentres," especially those of "American tech giants," for the strain on the grid.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Region of Southern Denmark5
ProjectCompanyStatusPower
Prime Esbjerg (ESB01)Esbjerg Prime Data Centers Proposed 550 MW
atNorth DEN02 (Varde) atNorth (CPP Investments / Equinix) Proposed 250 MW
Bulk DK01 Campus (Esbjerg, Denmark) Bulk Infrastructure Operating Not reported
Google Aabenraa Google Proposed Not reported
Google Fredericia Google Operating Not reported

Open the Region of Southern Denmark page

Capital Region of Denmark2
ProjectCompanyStatusPower
atNorth DEN01 (Copenhagen) atNorth (CPP Investments / Equinix) Operating 30 MW
Digital Realty Copenhagen Ballerup Digital Realty Operating Not reported Source off site ↗

Open the Capital Region of Denmark page

Central Denmark Region1
ProjectCompanyStatusPower
Apple ViborgExact site not confirmed Apple Operating Not reported

Open the Central Denmark Region page

North Denmark Region1
ProjectCompanyStatusPower
Prime Sæby (Denmark)Saeby Prime Data Centers Not reported 124 MW Source off site ↗

Open the North Denmark Region page

Odense SØ1
ProjectCompanyStatusPower
Meta Odense Meta Operating Not reported

Open the Odense SØ page

Region Zealand1
ProjectCompanyStatusPower
Microsoft Køge (CPH03)Koge Microsoft Operating Not reported

Open the Region Zealand page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.