Global Data Centers.formerly Florida Data Centers

Home/Iceland/Hafnarfjarðarkaupstaður

Data centers by place

Data centers in Hafnarfjarðarkaupstaður: 1 project mapped

1 project tracked
·
1 operating
·
3 MW reported
atNorth ICE01 (Hafnarfjordur, Reykjavik metro) (Operating, 3.2 MW)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power1 site shown

Hafnarfjörður has Iceland's oldest dedicated data center. The atNorth facility on Steinhella began as Thor Data Center, formally opened in Hafnarfjörður as the first specialized Icelandic data center, with the Norwegian software company Opera as its largest customer, the local paper Fjarðarfréttir reported. Through a later chain of owners it became part of Advania Data Centers, which renamed itself atNorth in December 2020. DCD lists the site as atNorth's 3.2MW ICE01. In an interview with Fjarðarfréttir, atNorth chief executive Eyjólfur Magnús Kristinsson, a Hafnarfjörður native, said the roughly 2,600-square-metre building was essentially full, with space held for a European bank, and that there were no plans to expand it. Because the site is small, atNorth has to buy its power through the distributor HS Veitur rather than directly from the national grid operator Landsnet, which raises the price considerably, he said. He called that the "Achilles heel" of a location in a green neighbourhood. He said no bitcoin mining happens there, because it would never pay there, though it can still pay at the larger Reykjanesbær site. The company's growth has instead gone to its much larger campuses at Reykjanesbær and Akureyri.

Those campuses are where Iceland's data center boom is happening. atNorth said in November 2024 that it was investing 41.2 billion krónur in expanding them, with customers adding nearly 300 billion krónur of equipment, mbl.is reported. In September 2026, Iceland Review noted, atNorth changed hands in a $4 billion deal, days after Statistics Iceland reported that data-center-related investment had reached a record high even as GDP contracted. Iceland's industry spent years dominated by crypto mining; a 2018 KPMG report found 90 percent of the country's data center capacity mined crypto. atNorth told DCD it was no longer taking new crypto customers.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

Hafnarfjarðarkaupstaður1
ProjectCompanyStatusPower
atNorth ICE01 (Hafnarfjordur, Reykjavik metro) atNorth Operating 3.2 MW

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.