Global Data Centers.formerly Florida Data Centers

Home/Japan/Tokyo

Data centers by place

Data centers in Tokyo: 7 projects mapped

7 projects tracked
·
2 proposed or being built
·
5 operating
·
110 MW from the 2 active projects that report a figure
DayOne Fuchu Intelligent Park (Tokyo, Gaw Capital) (Under construction, 80 MW)NEXTDC TK1 Tokyo (Under construction, 30 MW)Google Koto-Ku (Operating)MC Digital Realty Mitaka (Operating)Equinix Tokyo Koto-ku Campus (TY4/TY5) (Operating)Lambda Tokyo (Equinix TY11) (Operating)Oracle Cloud Region Tokyo (Operating)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power7 sites shown

Tokyo is where Japan's data center fights have been sharpest, because operators have been building close to homes. Japanese building law has no definition of a data center, so a project classed as an "office" can go almost anywhere, which residents say is the root of the conflicts. In Hino, Mitsui Fudosan plans three buildings with a peak demand of about 250 megawatts on the former Hino Motors factory site next to streets of detached houses; it has cut the maximum height from 72 to 63.5 metres, but the old factory was under 30 metres, and a residents' group says the company has not disclosed its estimates of waste heat and noise. "Why bring a data center so close to where people live?" asked Yasuo Yamazaki, its co-chair. Residents in Koto, Akishima and Kodaira in Tokyo, and in Inzai and Saitama nearby, have joined forces and are petitioning for data centers to be defined in law.

Power is the other limit. TEPCO Power Grid had 15 gigawatts of data center transmission connection applications by the end of fiscal 2025, about a quarter of its peak demand, and its president has said it aims to halve the time it takes to connect them.

In Akishima, in western Tokyo, GLP's project covers about 590,000 square metres with eight data center buildings and three logistics warehouses. More than 220 residents petitioned against it in 2024, saying about 3,000 of the site's 4,800 trees would be felled and that the city's water comes solely from groundwater. "One company will be responsible for ruining Akishima," said Yuji Ohtake of the residents' group. In February 2026 residents protested outside city hall over how the city was drafting a new development ordinance. Governor Yuriko Koike told the metropolitan assembly on February 18 that Tokyo would publish guidelines on dialogue between data center operators and residents, the first of any prefecture.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

Tokyo7
ProjectCompanyStatusPower
DayOne Fuchu Intelligent Park (Tokyo, Gaw Capital) DayOne / Gaw Capital Under construction 80 MW
NEXTDC TK1 TokyoMinato-ku NEXTDC Under construction 30 MW
Equinix Tokyo Koto-ku Campus (TY4/TY5)Koto-kuExact site not confirmed Equinix Operating Not reported Source off site ↗
Google Koto-Ku Google Operating Not reported
Lambda Tokyo (Equinix TY11)Koto-ku Equinix Operating Not reported
MC Digital Realty MitakaExact site not confirmed MC Digital Realty Operating Not reported Source off site ↗
Oracle Cloud Region TokyoExact site not confirmed Oracle Operating Not reported

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.