Data centers in Abu Dhabi: 7 projects mapped

7 projects tracked
·
3 proposed or being built
·
2 operating
·
2 with no stage on record
·
6,036 MW from the 3 active projects that report a figure
OpenAI Stargate UAE (Under construction, 1,000 MW)Khazna Abu Dhabi AI Campus (Under construction, 5,000 MW)Khazna AUH5 (KIZAD, 6 buildings) (Not reported, 36 MW)AI71 Abu Dhabi (Not reported)Khazna AUH1 (Masdar City) (Operating)Khazna AUH4 (Mafraq) (Under construction)Khazna Al Ain Campus (Operating)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power7 sites shown

Abu Dhabi is building the UAE-US AI Campus, a 10-square-mile site announced by the U.S. and UAE presidents in May 2025, to be built by the Emirati AI company G42 and expected to grow to about 5 gigawatts of power. Its first 1-gigawatt piece is Stargate UAE, which G42's data center arm Khazna is developing with OpenAI, Oracle, Nvidia, Cisco and SoftBank. Khazna says it is on track to hand the first capacity to customers before the end of 2026.

In December 2025 Mubadala chief Khaldoon Al Mubarak said the first 200 megawatts would be ready in the third quarter of 2026, with more than 5,000 workers on site and over 100,000 cubic meters of concrete poured, The National reported. In August 2026 Khazna's Greg Jasmin told Khaleej Times two 100-megawatt buildings had been enclosed and installation was under way inside, and that work continued through the recent regional conflict without delivery delays.

Power is the open question. "It's not just Khazna building a data centre," Jasmin said. "It's the power generation, the transmission, the distribution to the site." In May 2025 UAE Energy Minister Suhail al-Mazrouei told a conference in Abu Dhabi that electricity demand for data centers was "overwhelming." Khazna, which controls about 70% of the UAE's operating data center capacity, also runs sites in Masdar City, where it added a 32-megawatt facility, and in Al Ain.

Projects not tied to an area

Sites whose records name no county. Everything else is on the pages listed above.

Abu Dhabi7
ProjectCompanyStatusPower
Khazna Abu Dhabi AI Campus Khazna Data Centers (G42) Under construction 5,000 MW
OpenAI Stargate UAEAl Dhafrah Khazna Data Centers (G42) Under construction 1,000 MW
Khazna AUH5 (KIZAD, 6 buildings)UAE Khazna Data Centers (G42) Not reported 36 MW
AI71 Abu Dhabi AI71 Not reported Not reported
Khazna Al Ain CampusUAE Khazna Data Centers (G42) Operating Not reported
Khazna AUH1 (Masdar City)UAEExact site not confirmed Khazna Data Centers (G42) Operating Not reported
Khazna AUH4 (Mafraq)UAEExact site not confirmed Khazna Data Centers (G42) Under construction Not reported