Global Data Centers.formerly Florida Data Centers

Home/Data centers/United Arab Emirates

Data centers by place

Data centers in the United Arab Emirates: 15 projects mapped

15 projects tracked
·
5 proposed or being built
·
5 operating
·
5 with no stage on record
·
6,145 MW from the 5 active projects that report a figure
OpenAI Stargate UAE (Under construction, 1,000 MW)Khazna Abu Dhabi AI Campus (Under construction, 5,000 MW)Khazna Ajman (Under construction, 100 MW)Khazna AUH5 (KIZAD, 6 buildings) (Not reported, 36 MW)Khazna Sharjah (Proposed, 9 MW)AI71 Abu Dhabi (Not reported)Digital Realty Dubai (Silicon Oasis) (Not reported)Equinix Abu Dhabi Center (AD1) (Operating)Oracle Cloud Region Dubai (Operating)Khazna AUH1 (Masdar City) (Operating)Khazna AUH4 (Mafraq) (Under construction)Khazna DXB1 (Meydan, Dubai flagship) (Operating)Khazna DXB9 (Jebel Ali) (Not reported)Khazna Dubai Design District node (Not reported)Khazna Al Ain Campus (Operating)
Boundaries: Natural Earth
Tracked projectBigger dot, more power15 sites shown

The UAE's biggest data center project is the UAE-US AI Campus in Abu Dhabi, a 10-square-mile site that G42's Khazna Data Centers plans to grow to about 5 gigawatts of power. Its first piece is Stargate UAE, a 1-gigawatt cluster built with OpenAI, Oracle, Nvidia, Cisco and SoftBank. Its first 200 megawatts were due in the third quarter of 2026; in August Khazna said two 100-megawatt buildings were enclosed with equipment going in and that it was on track to hand over capacity to customers this year.

Khazna, which controls most of the country's data center capacity, says it runs about 300 megawatts in the UAE with almost 370 more under construction or commissioning. That includes a 100-megawatt campus in Ajman, 20 halls of 5 megawatts each, and 200 megawatts for Microsoft due before the end of 2026. In Dubai, the telecom company du signed a $544.54 million deal with Microsoft in 2025 for a new large data center.

The 2026 war with Iran reached the industry here. Amazon said two of its UAE data centers were struck by drones in March, and in September it said some customer data held only in the damaged facilities could not be recovered. Power is the other pressure: Wood Mackenzie estimates UAE data centers used 3 terawatt-hours in 2025, about 2% of national demand, and will use more than 6 by 2030. Khazna's commercial chief, Greg Jasmin, said the campus depends as much on new power generation and transmission as on the buildings.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Abu Dhabi7
ProjectCompanyStatusPower
Khazna Abu Dhabi AI Campus Khazna Data Centers (G42) Under construction 5,000 MW
OpenAI Stargate UAEAl Dhafrah Khazna Data Centers (G42) Under construction 1,000 MW
Khazna AUH5 (KIZAD, 6 buildings)UAE Khazna Data Centers (G42) Not reported 36 MW
AI71 Abu Dhabi AI71 Not reported Not reported
Khazna Al Ain CampusUAE Khazna Data Centers (G42) Operating Not reported
Khazna AUH1 (Masdar City)UAEExact site not confirmed Khazna Data Centers (G42) Operating Not reported
Khazna AUH4 (Mafraq)UAEExact site not confirmed Khazna Data Centers (G42) Under construction Not reported

Open the Abu Dhabi page

Dubai5
ProjectCompanyStatusPower
Digital Realty Dubai (Silicon Oasis)UAE Digital Realty Not reported Not reported Source off site ↗
Khazna Dubai Design District nodeUAE Khazna Data Centers (G42) Not reported Not reported Source off site ↗
Khazna DXB1 (Meydan, Dubai flagship)UAE Khazna Data Centers (G42) Operating Not reported
Khazna DXB9 (Jebel Ali)UAE Khazna Data Centers (G42) Not reported Not reported
Oracle Cloud Region DubaiUAEExact site not confirmed Oracle Operating Not reported

Open the Dubai page

UAE2
ProjectCompanyStatusPower
Khazna SharjahSharjahExact site not confirmed Khazna Data Centers (G42) Proposed 9 MW Source off site ↗
Equinix Abu Dhabi Center (AD1)Abu Dhabi Equinix Operating Not reported Source off site ↗

Open the UAE page

Ajman1
ProjectCompanyStatusPower
Khazna Ajman Khazna Data Centers (G42) Under construction 100 MW

Open the Ajman page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.