Global Data Centers.formerly Florida Data Centers

Home/United States/Georgia/Whitfield County

Data centers by place

Data centers in Whitfield County, Georgia: 3 projects mapped

3 projects tracked
·
3 operating
·
170 MW from the 2 active projects that report a figure
Core Scientific Dalton (Operating, 142 MW)CoreWeave Dalton 1 & 2 (Operating, 28 MW)Data center (Operating)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power3 sites shown

Dalton and Whitfield County have hosted Core Scientific since 2018, when the joint development authority approved $42 million in bonds for what was then called a "technology facility." Two Dalton sites, now serving the AI cloud company CoreWeave, report a combined 170 megawatts and are operating. A third, larger site is under construction nearby: Dalton 4, a 250,000-square-foot building on 170 acres on Old Tilton Road, rezoned from agricultural land in March 2025, that Core Scientific had targeted to open by July 2026; that date has passed with no opening announced.

The state Environmental Protection Division is reviewing a permit for up to 80 diesel backup generators at Dalton 4, compared with eight at the older Industrial South Road site. Money keeps growing alongside it: the county court validated about $1.49 billion in Core Scientific and CoreWeave bonds in October 2025, and in June 2026 a judge was asked to validate $15.2 billion more, including $13.1 billion in equipment financing for CoreWeave Dalton II. The bonds are not taxpayer-backed, but they cut the projects' property taxes under Georgia's development authority lease structure.

Read more

Some residents want a moratorium, as neighboring Walker County and Calhoun have adopted. "With Dalton now having an AI center put in the city, we want to make sure that the next one isn't allowed," said Quentin Postell, a candidate for state House. County Administrator Bob Sivick said in July the board saw no need for one "because there's nothing in the works, and there hasn't been any problems with data centers here either in the construction or their operation."

A separate, unrelated small data center on South Thornton Avenue near downtown Dalton, on record from a commercial property listing, has no connection to the Core Scientific sites.

Data center projects on record in Whitfield County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Dalton3
ProjectCompanyStatusPower
Core Scientific DaltonDalton Core Scientific Operating 142 MW
CoreWeave Dalton 1 & 2Dalton Core Scientific Operating 28 MW
Data centerDalton Not reported Operating Not reported Source off site ↗

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.