Data centers in Jefferson County, Kentucky: 1 project mapped

1 project tracked
·
1 proposed or being built
·
402 MW reported
·
1 moratorium or ban in effect
PowerHouse Louisville (Under construction, 402 MW)
Imagery: Esri, Maxar
Tracked projectBigger dot, more power1 site shown

Kentucky's first hyperscale data center is going up in Louisville's industrial West End. PowerHouse Data Centers and the Louisville developer Poe Companies are building on a 154-acre site on Camp Ground Road, near LG&E's 640-megawatt Cane Run gas plant and the Rubbertown chemical corridor. DataCenterDynamics reported an initial 335 megawatts of power, expandable to 402 megawatts, and a first 130-megawatt building due in October 2026, fed by a new LG&E switching facility and an on-site substation. Because the land is zoned for heavy industry, the project never needed a rezoning; it moved through the city's process as a "telecommunications hotel," a term city code doesn't define, so each new building needed only a routine permit rather than a public zoning case.

When revised plans for seven buildings went to the Planning Commission in March 2026, more than 20 residents spoke against them. "If we allow the data center to be built before we have the most protective laws in place, we run the risk of industry setting the standard," said Chickasaw resident Eboni Neal Cochran. The commission approved the plans anyway. "We're not voting on whether [artificial intelligence] is going to continue," said Commissioner William Fischer, explaining that the commission could judge only whether the plans met the code. Each server building will have its own diesel backup generator.

Read more

The fight then moved to the whole county. In August 2026 Dermody Properties filed to convert a 350,000-square-foot warehouse on Kramers Lane into a data center. District 1 council member Tammy Hawkins accused it of trying to "backdoor" the plan ahead of a pause. On August 13 the Metro Council voted 24-1 for a moratorium on new data center approvals, including conversions of existing buildings; it runs six months, into February, or until the council adopts zoning rules. Mayor Craig Greenberg, who had welcomed the Camp Ground project, endorsed the pause as public pressure grew.

The rules now before the council, recommended by the Planning Commission, would ban data centers larger than 500,000 square feet; smaller ones would need rezoning, closed-loop water cooling and a quarter-mile buffer from schools, community centers and other data centers. A city survey of about 3,600 people found most wanted data centers banned outright, and Hawkins has asked whether the council can simply do that; an assistant county attorney said it could, if it can show a rational basis. The council's zoning committee began debating the rules on September 15 and was due to take it up again about two weeks later; no vote has been scheduled.

Power is the other thread. In October 2025 the state Public Service Commission let LG&E and Kentucky Utilities spend $3 billion on two new gas plants, one of them in Louisville, mostly to serve an expected 1,470 megawatts of data center load growth, and warned the utilities not to build them if that demand doesn't materialize. The Sierra Club's Elisa Owen said the commission had "rubber-stamped" a plan that puts "speculative data centers" ahead of residents. Kentucky has also created a 50-year property tax exemption for data centers in Jefferson County.

Data center projects on record in Jefferson County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Louisville1
ProjectCompanyStatusPower
PowerHouse LouisvilleLouisville PowerHouse Data Centers Under construction 402 MW

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Moratoriums and bans in effect

Pauses on new data centers covering this area.

PlaceTypeStartedEnds
LouisvilleTown or city Moratorium Aug 13, 2026 Feb 13, 2027 Record off site ↗

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.