Global Data Centers.formerly Florida Data Centers

Home/Data centers/France

Data centers by place

Data centers in France: 22 projects mapped

22 projects tracked
·
7 proposed or being built
·
12 operating
·
3 stopped or paused
·
3,974 MW from the 11 active projects that report a figure
Campus IA (Fouju) (Approved, 1,400 MW)Brookfield/Data4 Cambrai (E-Valley) (Proposed, 1,000 MW)Brookfield/Data4 Escaudain (Proposed, 700 MW)Google Chateauroux (Proposed, 500 MW)CloudHQ Paris (Lisses) (Operating, expanding, 148.8 MW)Fluidstack Bosquel (Cancelled)Sesterce · Alixan (Blocked, 60 MW)Segro · Le Bourget (Blocked, 75 MW)Mistral Bruyeres-le-Chatel (Under construction, 60 MW)NTT Paris 1 (Corbeil-Essonnes) (Proposed, 84 MW)CyrusOne Paris PAR1 (Operating, 27 MW)Digital Realty PAR13 (Les Ulis) (Operating, 30 MW)Digital Realty PAR8 (Operating, 19 MW)Data4 Paris PAR02 (Marcoussis) (Operating, 5 MW)Digital Realty Paris Digital Park (La Courneuve PAR7/11) (Operating)Digital Realty PAR15 (Dugny Digital Hub) (Approved)Digital Realty Marseille (MRS1-3) (Operating)Equinix xScale Paris Saint-Denis (PA8x/PA9x) (Operating)Equinix Paris Pantin Campus (PA6/PA7) (Operating)Equinix Bordeaux Subsea Hub (BX1) (Operating)Oracle Cloud Region Marseille (Operating)Data4 Paris-Saclay PAR01 (Marcoussis, 23 buildings) (Operating)
Boundaries: Natural Earth
Tracked projectStopped or pausedBigger dot, more power22 sites shown

France's biggest data center fight is over Campus IA at Fouju, near Melun in Seine-et-Marne: eleven data centers on about 90 hectares, 70 of them mostly cereal fields, eventually drawing up to 1,400 megawatts of power, about as much as one nuclear reactor. The Seine-et-Marne prefect authorized the first buildings on July 29, 2026, after a public inquiry held from April 30 to May 30. Opponents, led by France Nature Environnement and the farmers' union Confédération paysanne, are weighing a court appeal.

They object to the loss of farmland, the heat, more than 600 backup generators running on fuel oil, and refrigerants classed as PFAS chemicals. A petition against the project has more than 50,000 signatures. The grid operator RTE plans to connect the site in steps, 240 megawatts by the end of 2027 and 700 by the end of 2029. The prefect's order bans drawing local water for cooling.

Read more

Residents have won twice this summer. In Le Bourget, north of Paris, the newly elected mayor, Mehdi Nezzar, withdrew Segro's building permit for a data center on the former H&M site on June 12, 2026; on July 28 the Montreuil administrative court refused to suspend his decision. On July 10, a judge in Grenoble suspended Sesterce's permit for an AI computing center of more than 60 megawatts at the Rovaltain business park in Alixan, near Valence, because no environmental impact study had been done.

The largest plans are in the north. SoftBank has committed up to 75 billion euros for AI data centers in France, starting with 3.1 gigawatts by 2031 at Loon-Plage near Dunkirk, Bosquel and Bouchain.

Every region we track

Projects on record, place by place

Open a place to see what is proposed, being built, running or stopped there. The report above may name projects that have no record here yet.

Île-de-France11
ProjectCompanyStatusPower
Campus IA (Fouju) MGX/Bpifrance/Mistral/NVIDIA Approved 1,400 MW
NTT Paris 1 (Corbeil-Essonnes) NTT Global Data Centers Proposed 84 MW
Segro · Le BourgetLe Bourget Segro Blocked 75 MW
Mistral Bruyeres-le-Chatel Eclairion Under construction 60 MW
Digital Realty PAR13 (Les Ulis) Digital Realty Operating 30 MW
Digital Realty PAR8Exact site not confirmed Digital Realty Operating 19 MW
Data4 Paris PAR02 (Marcoussis) Data4 (Brookfield) Operating 5 MW Source off site ↗
Data4 Paris-Saclay PAR01 (Marcoussis, 23 buildings) Data4 (Brookfield) Operating Not reported
Digital Realty PAR15 (Dugny Digital Hub)Exact site not confirmed Digital Realty Approved Not reported
Digital Realty Paris Digital Park (La Courneuve PAR7/11) Digital Realty Operating Not reported
Equinix Paris Pantin Campus (PA6/PA7)Aubervilliers Equinix Operating Not reported Source off site ↗

Open the Île-de-France page

Hauts-de-France3
ProjectCompanyStatusPower
Brookfield/Data4 Cambrai (E-Valley) Data4 Proposed 1,000 MW
Brookfield/Data4 EscaudainExact site not confirmed Brookfield/Data4 Proposed 700 MW
Fluidstack BosquelExact site not confirmed Fluidstack Cancelled Not reported

Open the Hauts-de-France page

Provence-Alpes-Côte d'Azur2
ProjectCompanyStatusPower
Digital Realty Marseille (MRS1-3) Digital Realty Operating Not reported
Oracle Cloud Region Marseille Oracle Operating Not reported

Open the Provence-Alpes-Côte d'Azur page

Auvergne-Rhône-Alpes1
ProjectCompanyStatusPower
Sesterce · Alixan Sesterce Blocked 60 MW

Open the Auvergne-Rhône-Alpes page

Bordeaux1
ProjectCompanyStatusPower
Equinix Bordeaux Subsea Hub (BX1) Equinix Operating Not reported Source off site ↗

Open the Bordeaux page

Centre-Val de Loire1
ProjectCompanyStatusPower
Google ChateaurouxIndreExact site not confirmed Google Proposed 500 MW

Open the Centre-Val de Loire page

Essonne1
ProjectCompanyStatusPower
CyrusOne Paris PAR1WissousExact site not confirmed CyrusOne Operating 27 MW Source off site ↗

Open the Essonne page

Lisses1
ProjectCompanyStatusPower
CloudHQ Paris (Lisses) CloudHQ Operating, expanding 148.8 MW

Open the Lisses page

Pantin1
ProjectCompanyStatusPower
Equinix xScale Paris Saint-Denis (PA8x/PA9x) Equinix Operating Not reported

Open the Pantin page

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Where people here have won

Projects stopped by a vote, pulled by their developer, or blocked in court.

PlaceWhat happenedDateSize
Le BourgetSegro Blocked in court Project blocked; court refused to revive it. Jul 28, 2026 25,000 sqm
AlixanSesterce Blocked in court Administrative court suspended the project. Jul 10, 2026 40 MW

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.