PowerHouse Irving (Las Colinas) data center, Irving, Texas
111 Customer Way, Irving, TX 75039
PowerHouse Data Centers·Under construction·201 MW
PowerHouse Data Centers has an Irving data center project in Dallas County, Texas, listed as under construction. Its facility page lists a maximum utility power supply of 201 megawatts. The 50-acre site could hold up to three buildings.
PowerHouse lists 946,200 square feet of developable space and buildings up to three stories high. The facility page gave a first-quarter 2026 delivery target.
The facts on file
- Company
- PowerHouse Data Centers
- Address
- 111 Customer Way, Irving, TX 75039
- County
- Dallas County, Texas
- Country
- United States
- Status
- Under construction
- Power
- 201 MW
- On that figure
- max utility power, up to 3 buildings
- Operating or planned
- 2024
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
- QTS Irving4 km
- Equinix Dallas Suburban Campus (Plano DA9/DA11)listed on the Dallas County page7 km
- Prime Dallas (DFW01 Round Table)8 km
- CyrusOne Carrollton DFW1listed on the Denton County page12 km
- CyrusOne Lewisville DFW2listed on the Denton County page14 km
- Equinix Dallas Infomart Interconnection Hub (DA1-DA4, DA6)listed on the Dallas County page15 km
- Digital Realty DFW10 (2323 Bryan St)listed on the Dallas County page18 km
- DataBank Dallas metro (DFW1-DFW8)listed on the Dallas County page18 km
Moratoriums covering this site
| Place | Type | Started | Ends | |
|---|---|---|---|---|
| TexasState | Moratorium | Aug 3, 2026 | No end date | Record off site ↗ |
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.