Global Data Centers.formerly Florida Data Centers

Home/United States/Georgia/DeKalb County

Data centers by place

Data centers in DeKalb County, Georgia: 3 projects mapped

3 projects tracked
·
2 operating
·
1 stopped or paused
·
15 MW from the one active project that reports a figure
·
2 moratoriums and bans in effect
Project Preserve (Ellenwood) (Blocked)ATL1 (Operating, 15 MW)Lumen Doraville 1 (Operating)
Imagery: Esri, Maxar
Tracked projectStopped or pausedBigger dot, more power3 sites shown

DeKalb County has banned new data center applications since July 2025, a pause extended repeatedly and now running through March 30, 2027. The county's data centers on record are a DC Blox site and Lincoln Rackhouse's 88,000-square-foot ATL1 building, which operates at 15 megawatts. Commissioners rejected a special land use permit for a third, PCC-DeKalb's three-building campus in Ellenwood, on August 13, 2026.

Ellenwood, a majority-Black community in south DeKalb, fought the PCC-DeKalb project for nearly a year. "If I sit outside too long, then my sinuses begin to act up," said Jackie Malcom, who lives less than a quarter mile from the site and organizes with the DeKalb Citizens Coalition. Resident Gina Mangham pointed to sewage overflows and water main breaks: "We already have a strained water system in DeKalb County." The county is now being sued by Shadowbox Studios, which wants to build its own data center and argues the moratorium is a ban "without any rational basis."

Inside the county, Chamblee adopted its own moratorium in July 2026, running through January 16, 2027.

Data center projects on record in DeKalb County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Atlanta2
ProjectCompanyStatusPower
ATL1Atlanta Lincoln Rackhouse Operating 15 MW
Lumen Doraville 1Atlanta Lumen Operating Not reported
Ellenwood1
ProjectCompanyStatusPower
Project Preserve (Ellenwood)Ellenwood PCC-DeKalb LLC Blocked Not reported

Where this comes from

The reporting above was written from these. Open one and check it yourself.

Moratoriums and bans in effect

Pauses on new data centers covering this area.

PlaceTypeStartedEnds
ChambleeTown or city Moratorium Jul 22, 2026 Jan 16, 2027 Record off site ↗
DeKalb County Moratorium Jul 8, 2025 Mar 30, 2027 Record off site ↗

Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to [email protected] and it gets fixed.