Data centers in Douglas County, Georgia: 11 projects mapped

11 projects tracked
·
1 proposed or being built
·
5 operating
·
1 stopped or paused
·
4 with no stage on record
·
430 MW from the 3 active projects that report a figure
STACK Atlanta (Lithia Springs) (Operating, 160 MW)Switch Keep Campus (Douglasville) (Operating, 150 MW)DataBank Lithia Springs Campus (Atlanta 95 acres) (Operating, 120 MW)EdgeConneX · Douglas County (Blocked)Google Douglas County (Operating)Aligned ATL-01 (Not reported)Microsoft Douglasville (Under construction)Digital Realty Austell (101 Aquila Way) (Not reported)Digital Realty ATL11 (Douglasville) (Not reported)T5 Atlanta Campus (Lithia Springs) (Not reported)CoreWeave Douglasville (Flexential) (Operating)
Imagery: Esri, Maxar
Tracked projectStopped or pausedBigger dot, more power11 sites shown

Douglas County has at least 11 data center sites, most already operating, and in July 2026 commissioners rejected a large new one for the second time in seven months. EdgeConneX, filing as East Village Dothan LLC, wanted about 700 acres near Liberty Road rezoned for six buildings and a substation; part of the site lies in the Dog River Basin, the county's main water source. Commissioners voted 4-1 to deny it, following a unanimous no from the Planning and Zoning Commission.

The county's planning manager, Allison Duncan, said unincorporated Douglas County already has about 2.5 million square feet of data center space in eight buildings, including STACK Infrastructure's 160-megawatt Lithia Springs campus, Switch's 150-megawatt Switch Keep, and sites for Google, Aligned Data Centers, DataBank, T5 Data Centers, CoreWeave/Flexential and Microsoft; Digital Realty runs two more in Austell. She warned the county was at risk of overbuilding. "That's what a data center sounds like," said resident Eileen Roberts, playing a recording of industrial whirring at the hearing. "That's 365 days a year, 24/7."

The county has also paused new applications for data centers larger than 50,000 square feet since March 2026, a freeze extended to study what new power lines would cost ratepayers. "New power generation infrastructure ... tends to require 40 to 50 years to pay off," Duncan said.

Data center projects on record in Douglas County

Grouped by the town each site sits in. The report above may name projects that have no record here yet.

Lithia Springs5
ProjectCompanyStatusPower
STACK Atlanta (Lithia Springs)Lithia Springs STACK Infrastructure Operating 160 MW
Switch Keep Campus (Douglasville)Lithia Springs Switch Operating 150 MW
Aligned ATL-01Lithia Springs Aligned Data Centers Not reported Not reported Source off site ↗
Google Douglas CountyLithia Springs Google Operating Not reported
T5 Atlanta Campus (Lithia Springs)Lithia Springs T5 Data Centers Not reported Not reported Source off site ↗
Austell2
ProjectCompanyStatusPower
Digital Realty ATL11 (Douglasville)Austell Digital Realty Not reported Not reported Source off site ↗
Digital Realty Austell (101 Aquila Way)Austell Digital Realty Not reported Not reported Source off site ↗
Douglasville2
ProjectCompanyStatusPower
CoreWeave Douglasville (Flexential)Douglasville Flexential Operating Not reported
Microsoft DouglasvilleDouglasville Microsoft Under construction Not reported
Douglas County1
ProjectCompanyStatusPower
EdgeConneX · Douglas CountyDouglas County EdgeConneX Blocked Not reported
South Fulton1
ProjectCompanyStatusPower
DataBank Lithia Springs Campus (Atlanta 95 acres)South FultonExact site not confirmed DataBank Operating 120 MW